Telecommunication



Link Survey:

1.       Complete survey as per Operator standard

  1. Provide necessary data & relevant picture to analyze the feasibility of microwave transmission links
  1. Confirm LOS status, antenna height at tower, antenna side arm requirement, requirement for pole in rooftop site
  1. Provide terrain sample including co-ordinate of obstacles
  1. Provide picture of LOS with link sites( more than 1), Obstacle picture, Microwave pole location proposed
  1. Provide date on Microwave location at Tower, Tower image, Indoor IDU space/power availability and IF cable length etc,
  1. Submissions survey report soft copy

  1. Any other relevant requirement from customer need to be fulfill
Green Field Tower