Link Survey:
1. Complete survey as per Operator standard
- Provide
necessary data & relevant picture to analyze the feasibility of
microwave transmission links
- Confirm
LOS status, antenna height at tower, antenna side arm requirement,
requirement for pole in rooftop site
- Provide
terrain sample including co-ordinate of obstacles
- Provide
picture of LOS with link sites( more than 1), Obstacle picture, Microwave
pole location proposed
- Provide date on Microwave location at
Tower, Tower image, Indoor IDU space/power availability and IF cable
length etc,
- Submissions
survey report soft copy
- Any
other relevant requirement from customer need to be fulfill
| Green Field Tower |
No comments:
Post a Comment